Valero-Hartford River Terminal Pipeline
Juneau served as a subcontractor to STV Incorporated to provide professional land surveying services in connection with the construction of a 14,000-foot pipeline from the Valero-Hartford River Terminal to a point near their south tank farm in Hartford, Illinois.
Juneau provided the initial topographic and right of way surveys, construction staking and as-built surveys for the construction of a proposed 14,000 foot long crude oil pipeline running from the Valero-Hartford Terminal on the Chain of Rocks Canal to the Valero south tank farm in Hartford, Illinois.
In addition, Juneau surveyed the individual properties along the route and prepared all the easement documents required for the properties affected by the construction project.